BTO Renovation Package

Singapore's Best BTO Renovation Package 🔥
2 room bto renovation package: $7588
3 room bto renovation package: $9588
4 room bto renovation package: $10588
5 room bto renovation package: $11588

A. Professional Service

  1. Professional Design Consultation and Space Planning

  2. 3D Visual Perspective Presentation

  3. Workmanship warranty after sales service

  4. Materials and colour selection

  5. Project management and site supervision

B. Masonry Works

  1. Supply labour and materials to do cement screeding in the living room and three bedrooms.

  2. Supply labour and materials to lay floor and skirting tiles using homogeneous tiles in the living room and three bedrooms. (Owner supply tiles)

C. Plumbing Works

  1. Supply labour to install a kitchen sink and tap.

D. Carpentry Works

  1. Design and fabricate top and bottom kitchen cabinets in solid plywood and laminate finish (total of 20 feet).
    The 2-room package is (total of 16 feet).

    • •ABS trimming doors and handles

    • •Frosted glass panel door x 1

    • •Soft-close hinges

    • •Dish rack x 1

    • •Free Upgrade to Internal Colour PVC

  2. Supply labour and material to install quartz countertops.

E. Miscellaneous Works

  1. Laying a corrugated board for protection

  2. Clearing of debris off the renovation site

  3. To provide haulage of building materials

  4. General washing and chemical washing

Advice for anyone considering HDB BTO renovation


1. To avoid renovation failures, get financial guidance
In addition to deciding which renovation package is right for you, you also need to set a strict budget for the entire renovation process. Unexpected costs would be one of the main causes of failures. Should the budget be surpassed, the entire BTO package may suffer. In the worst situation, the project fails completely. By getting competent financial guidance, this can be easily avoided.

2. Make preparations in advance
It makes sense that your life will be less hectic the more time you have. An elaborate plan will keep you from going beyond your intended finish date. To put it another way, you can begin planning as soon as you have a floor plan. You're contracting for the work, so even with a reputable business, hurrying your home improvements can still lower the quality.



How long do renovation projects at BTO take on average?


It should take, on average, six to eight weeks. Please be aware that every BTO decorate is distinct from the others. As a result, the amount of work you want done will determine how long the renovation job takes to finish.


Would renovation raise your HDB's worth?


It varies. Only if prospective buyers find your renovations appealing and decide to keep them will they raise the selling price of your home. As a result, it is dependent upon your customers' tastes.